You have designed your patio, chosen your slabs and booked a free weekend. Now comes the question that stops many DIYers in their tracks when they ring a builders' merchant: how much MOT Type 1 do I need? Order too little and your project stalls halfway through. Order too much and you are left with a pile of aggregate on the driveway and money wasted.

The good news is that the calculation is simple once you know the formula. This guide shows you how to work out the tonnage for any patio, path or driveway, includes a quick-reference table and worked examples, and explains the allowances that catch people out.

The Basic Formula

Aggregate suppliers sell MOT Type 1 by weight, usually per tonne or in bulk bags, so the aim is to calculate tonnes. Here is the formula:

Tonnes of Type 1 = area (m²) × sub-base depth (in metres) × 2.1

The figure of 2.1 is the approximate density of compacted Type 1 in tonnes per cubic metre. Actual density varies a little between suppliers and stone types, commonly somewhere between 2.0 and 2.2, so 2.1 is a sensible working figure. Your supplier can tell you the figure for their own material.

Remember to convert millimetres into metres. 100mm is 0.1m, 150mm is 0.15m, and so on. If you are new to measuring areas, our guide to the method for calculating square metreage for a paving project shows you how to handle rectangles, L-shapes and curves.

Step 1: Measure Your Area Correctly

Your sub-base needs to be larger than the visible slabs. Standard practice is to extend it by around 100mm beyond the paved edge so that the outer slabs and any edge restraint are fully supported. Measure the area of the whole excavation, not only the paving. For a rectangular patio 4m by 3m, adding 100mm all round gives an excavation of 4.2m by 3.2m, or 13.44m².

For odd shapes, break the patio into simple rectangles and triangles, calculate each, and add the totals.

Step 2: Choose Your Sub-Base Depth

Depth depends on soil and use. As a guide, 100mm suits standard garden patios on firm ground, 150mm or more suits clay and soft ground, and 150 to 200mm suits driveways. If you are unsure, our guide to how deep a patio sub-base should be explains how to choose, including how to work out your full dig-out depth.

Step 3: Do the Sum

Let's use the 13.44m² excavation above with a 100mm sub-base:

13.44 × 0.1 × 2.1 = 2.82 tonnes

Step 4: Add a Wastage Allowance

No site is perfectly level, and some material is lost to uneven ground, spillage and over-excavation. Add around 5 to 10 per cent to your total. On soft or uneven ground, or if you are a first-timer, lean towards 10 per cent. In our example, 2.82 tonnes plus 10 per cent comes to about 3.1 tonnes.

Quick Reference Table

This table shows approximate tonnes of compacted Type 1 needed per square metre at common depths, using 2.1 tonnes per cubic metre and before any wastage allowance.

Sub-base depth Tonnes per m² 10m² 20m² 30m²
75mm 0.16 1.6 3.2 4.7
100mm 0.21 2.1 4.2 6.3
150mm 0.32 3.2 6.3 9.5
200mm 0.42 4.2 8.4 12.6

Add 5 to 10 per cent to the figure you read from the table, and round up to the next practical delivery size.

Worked Examples

Example 1: Small Seating Area

A 3m by 3m patio on firm ground, with a 100mm sub-base. Add 100mm around the edge, so the excavation is 3.2m by 3.2m = 10.24m².

10.24 × 0.1 × 2.1 = 2.15 tonnes, plus 10 per cent = about 2.4 tonnes.

Example 2: Average Family Patio

A 5m by 4m patio, 100mm sub-base. Excavation is 5.2m by 4.2m = 21.84m².

21.84 × 0.1 × 2.1 = 4.59 tonnes, plus 10 per cent = about 5.0 tonnes.

Example 3: Patio on Clay

A 6m by 5m patio on clay soil, 150mm sub-base. Excavation is 6.2m by 5.2m = 32.24m².

32.24 × 0.15 × 2.1 = 10.16 tonnes, plus 10 per cent = about 11.2 tonnes.

Example 4: Driveway

A driveway 5m by 3m with a 200mm sub-base. Excavation is 5.2m by 3.2m = 16.64m².

16.64 × 0.2 × 2.1 = 6.99 tonnes, plus 10 per cent = about 7.7 tonnes.

Tonnes, Cubic Metres and Bulk Bags

Some suppliers quote by volume rather than weight. If you work out your compacted volume (area × depth), you need to order extra loose material, because Type 1 compacts down significantly when you run a plate compactor over it. A rough rule is to multiply the compacted volume by about 1.3 for the loose volume. Ordering by weight using the 2.1 density figure already accounts for this, which is why most people find it simpler.

Bulk bags are a popular option for smaller patios, as they can be delivered to a driveway and dropped where you need them. Bag sizes vary by supplier, typically from around 800kg to a tonne, so check the actual weight before dividing your total. For a 5-tonne patio you might order five or six bags. Loose tipped loads are cheaper per tonne for larger jobs, but you need space and a way to move the material, such as a wheelbarrow or dumper.

Factors That Change How Much You Need

  • Soft or uneven ground: needs extra depth and extra material to level.
  • Falls: if your patio slopes away from the house, you will use slightly more at the lower end. See the correct patio drainage gradient for how much fall to build in.
  • Edge restraint and foundations: concrete haunching on the edges takes space from the sub-base footprint, but the sub-base area still needs to cover everything beneath.
  • Slab thickness: thicker slabs mean a deeper overall dig, but not necessarily more sub-base. Check the slab thickness before you excavate, using our size and thickness guide.
  • Membranes: on soft ground, geotextile helps keep stone clean and reduces the amount lost into the soil.
  • Existing hardcore: if you are replacing an old patio, compact rubble can sometimes be reused, but make sure it is clean, sound and properly compacted.

Do You Need Anything Else Besides Type 1?

Type 1 is just one layer of the build. For a full material list, you will also need:

  • A bedding layer, typically sharp sand and cement mix or a mortar mix, depending on your slab type
  • A priming slurry or bonding agent for porcelain, where required
  • Jointing compound suitable for your slabs
  • Edge restraint materials such as concrete haunching
  • Geotextile membrane, if your ground is soft

To calculate the slabs themselves, read our guide to estimating the number of paving slabs for a patio project, and for a budget overview see how much paving slabs cost in the UK. For the process of laying, see how to lay paving slabs in your garden.

Compacting It Correctly

Buying the right amount is only half the job. Spread the Type 1 in layers of around 75 to 100mm and compact each layer with a plate compactor, which you can hire locally. Make several passes in different directions until the surface feels firm and the compactor stops sinking in. A well-compacted base uses the full tonnage you calculated; a base that has not been compacted will settle later and may leave your slabs sunken. For the background on why the material works, read what MOT Type 1 is and why it is used under paving.

Common Ordering Mistakes

  • Measuring only the slab area and forgetting the overhang of sub-base beyond the edge.
  • Forgetting to convert millimetres to metres in the formula.
  • Ignoring wastage, then running out with the delivery lorry long gone.
  • Mixing up volume and weight and ordering a cubic-metre figure as tonnes.
  • Using the wrong depth for the ground conditions or intended use.

Planning the Rest of Your Patio

Once the base is calculated, think about how the finished patio will perform. Heavier family use is covered in our guide to the best paving slabs for high-traffic garden areas, and weather resilience in is porcelain paving suitable for the British climate? Slab size also affects layout and cutting waste, so see comparing 600x600mm and 900x600mm paving slabs. Our drainage guide and UK guidelines page complete the planning picture, and popular slabs such as Dome Grey and Quartz White porcelain are good places to start browsing.

Frequently Asked Questions

How many tonnes of Type 1 cover 10 square metres?

At 100mm depth, 10m² needs about 2.1 tonnes before wastage, or roughly 2.3 tonnes with a 10 per cent allowance.

How much does a bulk bag of Type 1 cover?

A bag of around 800kg to 1 tonne covers roughly 4 to 5m² at 100mm depth. Check your actual bag weight.

Is it better to over-order or under-order?

Slightly over-order. Leftover Type 1 is easy to use for paths, filling dips or edging, while running out mid-project can cause delays and extra delivery charges.

Do I need Type 1 for porcelain paving?

Yes. Porcelain relies on a stable, well-compacted base to avoid cracking and hollow spots. See porcelain paving vs concrete and our porcelain collection for more on this material.

Final Thoughts

Working out your Type 1 order takes only a few minutes: measure the excavation area, choose your depth, multiply by 2.1, and add 5 to 10 per cent. Do the sum carefully and compact in layers, and you will have the stable, long-lasting base that every good patio needs. Once the foundations are sorted, you can focus on the fun part, choosing your slabs from our patio slabs, paving slabs and Indian sandstone collections.

Need help planning quantities? Contact our team and we will help you get your project right first time.

Back to blog